We are having an addition as well put in downstairs, but the rest of the house is being totally redone as well. Dust, paint smell, the works. I am personally directing the work in the HT, though. We thoroughly cover it during the day when the work in the other areas of the house are ongoing. When it comes time to do the HT (floor being redone, a new central air and heater for the HT room and painting and cabinetry work), we will have to move all to the next room - that will be a nightmare. But, I am playing too much the Pope Julius to my wife's Michaelangelo during the painting of the Sistine Chapel:

"Buonarotti! When will you make an end to it?

When it is finished!"

Thanks for the moral support!

Mike
_________________________
75" 4K HDR Sony XBR 75X95k mini-LED TV
Marantz AV7706 pre-pro
OPPO UDP 203 4K Ultra HD Blu-ray Player
Mirage HDT Speaker System (LCR [OM-5s for L&R and HDT-F for center], SR, SL, SBR, SBL [HDT-Rs])
Dual SVS PB12-Plus Subs
Outlaw Audio Model 7900 Power Amp w/Dual Emotiva CMX-2
AudioControl BijouTM THX� Equalizer
Rega RP1 Turntable
Dual Panamax M5300-PM Power Conditioners
Dual Monster Power HTS 2500 Power Conditioners
Dual Monster Power HDP 1800 Power Conditioners
Clearplay Blu-ray Player
Motorola VIP1200 HD cable receiver
Logitech Harmony Elite Remote